PRUNEROV II POWER PLANT
  • PRUNEROV II POWER PLANT
  • PRUNEROV II POWER PLANT
  • PRUNEROV II POWER PLANT
  • PRUNEROV II POWER PLANT

The challenge

  • Need to measure, check and create the model from more than 30.000 elements (beams, columns, bracing)
  • Size of the task

The solution

  • Successful import of parts measured by optical methods using geodetic total station
  • In modeling, the total model was broken into logical parts linked together as AutoCAD external references “xref”

“The project required to combine our own measurement evaluation software with Advance Steel. Without Advance Steel we would not have been able to handle the whole project.”

 

Mr. Novotny,

Managing Director 

Users’ benefits

  • Reduction of errors
  • Possibility to share full objects data across platform
  • Ease of design changes

 

 

  • Location: Prunerov II, Czech Republic
  • Architecture office: Viktovice Power Engineering
  • Contracting authority: CEZ
  • Dimensions: 250 x 80 x 80m
  • Specifications: Verified 3D model of steel structure
    25.000 tons of steel structure

GRAITEC GROUP 2017 At GRAITEC we take privacy seriously. Please read our privacy policy.