NIEDERWARTHA BRIDGE
  • NIEDERWARTHA BRIDGE
  • NIEDERWARTHA BRIDGE
  • NIEDERWARTHA BRIDGE
  • NIEDERWARTHA BRIDGE
  • NIEDERWARTHA BRIDGE

The challenge

  • Creation of welding preparation and folded plates
  • Exact creation of the geometry of single components
  • Bridge made of complex 3D girders

The solution

  • Creation of the bridge model in modular form
  • Clash detection tool
  • Specific commands for automatic creation of 3D plates

“The use of Advance Steel was a complete success for our work since the creation of models, BOMs and DStV-NC-data can be set in a modular way.” 

Mr. Streit,

Construction Engineer 

 

Users’ benefits

  • Low error rate at workshop and at site
  • Drawings that update after modifications

 

 

 

 

  • Location: Meißen, Germany
  • Contracting authority: Road Construction
    Office Meißen-Dresden
  • Dimensions: 366 meters’ long with a main span of 192 meters
  • Specifications: 1232 tons of steel

GRAITEC GROUP 2017 At GRAITEC we take privacy seriously. Please read our privacy policy.