NEW EXHIBITION CENTRE HALL
  • NEW EXHIBITION CENTRE HALL
  • NEW EXHIBITION CENTRE HALL
  • NEW EXHIBITION CENTRE HALL
  • NEW EXHIBITION CENTRE HALL
  • NEW EXHIBITION CENTRE HALL
  • NEW EXHIBITION CENTRE HALL

The challenge

  • Manufacturing – The biggest problem with this building was the intersections of tube diagonals with the upper/lower strip of truss beams/girder and welding preparations.

The solution

  • Tube diagonals were manufactured directly from the 3D model exploded to ACIS solids

With Advance Steel, the 3D modeling of steel frameworks of “Pavilion P“ enabled the realization of the model complexity and the detail control in the workshop documentation. To expedite the tube structure fabrication, the information from the 3D model was directly used for the fabrication of particular elements. Using Advance Steel improved the demanding deadlines both for the project and for the steel structure delivery period.

 

Vladimír Daněk, Michal Rudolf, OKF s.r.o,

Technical designers

 

Users’ benefits

  • Error reduction – controlling the model in 3D
  • BOMs derived from the model
  • Manufacturing directly from the 3D model

 

  • Location: Brno, Czech Republic
  • Architecture office: Arch Design, s.r.o.
  • Architecture office: BVV Brno, a.s.
  • Specifications: The new hall “P” in the Brno exhibition centre
  • Description: The exhibition part of pavilion “P” is designed as a two-aisle, one-storey hall with the possibility to parcel into separate parts.

GRAITEC GROUP 2017 At GRAITEC we take privacy seriously. Please read our privacy policy.