DIXON COURT
  • DIXON COURT
  • DIXON COURT
  • DIXON COURT
  • DIXON COURT
  • DIXON COURT
  • DIXON COURT
  • DIXON COURT

THE CHALLENGE

· Variations of many balconies in accordance with site survey’s
· Logistics of controlling the many parts that made up each balcony
· The many hours detailing each welded sub assembly for manufacture

THE SOLUTION

· Advance Steel’s ability to copy a model with all the drawings for manufacture and once this new model was modified, the drawings simultaneously updated too
· The automatic part enabler used in 2D and Isometric views

 

” Advance Steel helped me massively with the detail drawing side as there were a few variations of these balconies and Advance Steel allowed me to do these quickly and efficiently.”
Dan Coates,
Draftsman, AS FABRICATIONS

USERS’ BENEFITS

· Controlling the model in an easy to use interface
· BOM’s derived in conjunction with the model
· Reduced drawing time

  • Preliminary Design: Consul
  • Design, Manufacture and Installation: AS Fabrications
  • Building Contractor: Mulalley
  • Location: London, England
  • Dimensions: 4490mm long, 565mm wide,
    1430mm above floor level

GRAITEC GROUP 2017 At GRAITEC we take privacy seriously. Please read our privacy policy.