Bridge in the Moravina Karst near Holštejn
  • Bridge in the Moravina Karst near Holštejn
  • Bridge in the Moravina Karst near Holštejn
  • Bridge in the Moravina Karst near Holštejn
  • Bridge in the Moravina Karst near Holštejn
  • Bridge in the Moravina Karst near Holštejn

This bridge is situated in Protected Landscape Area of Moravian Karst near municipality of Holštejn and it supposed to replace the old temporary bridge – Bailey bridge. It is a single-span through arch road bridge, whose structural system is simply supported rigid beam reinforced with non-rigid arch with ties – „Langer beam“. Beams, arches with bracings are made of steel and welded. The composite steel-concrete deck consists of transverse beams connecting both main beams and reinforced concrete slab.

  • Software used: Advance Steel
  • Customer: FIRESTA – Fišer, rekonstrukce, stavby a. s.
  • Architecture office: Link projekt, s. r. o., Brno
  • Steel Structure Erector: FIRESTA – Fišer, rekonstrukce stavby a. s.
  • Contracting Authority: Správa a údržba silnic Jihomoravského kraje, príspevková organizace
  • Location: Road III/3783 Holštejn, SO 201 Bridge no. 3783-1
  • Dimensions: 70,0 x 8,5 m

GRAITEC GROUP 2017 At GRAITEC we take privacy seriously. Please read our privacy policy.